Back to search

Nanyang Technological University

Proposed insurance and reserve management scheme for Singapore electricity market

Abstract

dc:description.abstract

The objective of the research is to improve the market design in the Singapore Electricity Market. There are three aspects that this thesis tries to improve, i.e. loss of load compensation, reserve requirement criterion and reserve market settlement. Three new designs are proposed for incorporation in the Singapore Electricity Market respectively. They are the insurance scheme on the generation side, probabilistic reserve with demand side participation and probabilistic zero-sum settlement.

Degree

thesis:*
College dc:contributor.school
School of Electrical and Electronic Engineering
Year dc:date.issued
2006

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Xia, Linmin
Advisor dc:contributor.supervisor
  • Gooi Hoay Beng

Subjects

dc:subject × 1

Rights

dc:rights
Statement dc:rights
  • Nanyang Technological University

Identifiers

dc:identifier.*
Dc Identifier Citation
Xia, L. (2006). Proposed insurance and reserve management scheme for Singapore electricity market. Doctoral thesis, Nanyang Technological University, Singapore.

Chain of custody

source
Harvested from
Nanyang Technological University
Base URL
dr.ntu.edu.sg/oai/request
Last updated
2026-11-27
Source record
OAI-PMH GetRecord
citation

Xia, Linmin. Proposed insurance and reserve management scheme for Singapore electricity market. 2006. https://doi.org/10.32657/10356/3484