Back to search

Nanyang Technological University

Designing and comparing schedule-based manufacturing with MRPII

Abstract

dc:description.abstract

Schedule-based Manufacturing (SBM) is a paradigmatic shift in Manufacturing Planning and Control (MPC). It is a migration from the MRPII methodology. The approach of MRPII is largely procedural and is basically top-down, however SBM aims to adopt an integrated and responsive methodology capable of meeting the ever changing and increasing competition in market demand. Unlike MRPII, SBM merges the vertical separation of Master Schedule (MS) and Production Schedule (PS) by directly transforming master orders to scheduled works orders. It effectively resolves the differences between Material Requirements Planning (MRP) and Capacity Requirement Planning (CRP) by using the Bill of Manufacture (BOMF) instead of Bill of Materials (BOM). SBM is in fact an integrater of production planning and scheduling, it can provide an integrated solution to materials and resources for manufacturers [2].

Degree

thesis:*
College dc:contributor.school
School of Mechanical and Production Engineering
Year dc:date.issued
1996

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Tan, Choon Siang.

Subjects

dc:subject × 1

Rights

Language dc:language.iso
en

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10356/41557

Chain of custody

source
Harvested from
Nanyang Technological University
Base URL
dr.ntu.edu.sg/oai/request
Last updated
2026-11-27
Source record
OAI-PMH GetRecord
citation

Tan, Choon Siang.. Designing and comparing schedule-based manufacturing with MRPII. 1996. https://hdl.handle.net/10356/41557