A two-phase GA model for resource-contrained project scheduling

Abstract

dc:description.abstract

Project scheduling has a tremendous effect on the performance of a construction project. In project scheduling, problems can arise when each activity can be started at different time points and the resources needed by the activities are limited. Moreover, activities have required conditions to be met, such as precedence relationships, resource demands, etc. To resolve these problems, a two-phase GA (genetic algorithms) model was proposed in this research, in which both the effects of time-cost trade-off and resource scheduling were taken into account. A GA-based time-cost trade-off analysis was adopted to select the execution mode of each activity through the balance of time and cost, followed by utilization of a GA-based resource scheduling method to generate a feasible schedule which may satisfy all the project constraints.

Degree

thesis:*
College dc:contributor.school
School of Civil and Environmental Engineering
Year dc:date.issued
2005

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Weng, Haijie
Advisor dc:contributor.supervisor
  • Chen Po-Han

Subjects

dc:subject × 1

Rights

dc:rights
Statement dc:rights
  • Nanyang Technological University

Identifiers

dc:identifier.*
Dc Identifier Citation
Weng, H. (2005). A two-phase GA model for resource-contrained project scheduling. Master’s thesis, Nanyang Technological University, Singapore.

Chain of custody

source
Harvested from
Nanyang Technological University
Base URL
dr.ntu.edu.sg/oai/request
Last updated
2026-11-27
Source record
OAI-PMH GetRecord
citation

Weng, Haijie. A two-phase GA model for resource-contrained project scheduling. 2005. https://doi.org/10.32657/10356/46732