A two-phase GA model for resource-contrained project scheduling
Abstract
dc:description.abstractProject scheduling has a tremendous effect on the performance of a construction project. In project scheduling, problems can arise when each activity can be started at different time points and the resources needed by the activities are limited. Moreover, activities have required conditions to be met, such as precedence relationships, resource demands, etc. To resolve these problems, a two-phase GA (genetic algorithms) model was proposed in this research, in which both the effects of time-cost trade-off and resource scheduling were taken into account. A GA-based time-cost trade-off analysis was adopted to select the execution mode of each activity through the balance of time and cost, followed by utilization of a GA-based resource scheduling method to generate a feasible schedule which may satisfy all the project constraints.
Degree
thesis:*- College dc:contributor.school
- School of Civil and Environmental Engineering
- Year dc:date.issued
- 2005
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Weng, Haijie
- Advisor dc:contributor.supervisor
-
- Chen Po-Han
Subjects
dc:subject × 1Rights
dc:rights- Statement dc:rights
-
- Nanyang Technological University
Identifiers
dc:identifier.*- Identifier URI
- https://hdl.handle.net/10356/46732
- Dc Identifier Citation
- Weng, H. (2005). A two-phase GA model for resource-contrained project scheduling. Master’s thesis, Nanyang Technological University, Singapore.