Back to search

Nanyang Technological University

Improvement of production logistics for semiconductor backend manufacturing

Abstract

dc:description.abstract

The study focuses on determining the optimum lot size for the backend factory with the objective of achieving capacity increases with minimal equipment additions. The method used in the study describes the technical methodology and investigates an optimum lot size based upon given throughput and cycle time targets. The results of this study show that a larger lot size is very much desirable in the areas of the factory that are highly utilized. Small lot sizes will increase the number of setup for the machine, which will cause reduction in the output. The study also shows that different products will have a different lot sizes requirement because the processing time of the lot size will be different.

Degree

thesis:*
College dc:contributor.school
School of Mechanical and Production Engineering
Year dc:date.issued
2004

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Tng, Long Khim.
Advisor dc:contributor.supervisor
  • Lam, Soi Hoi

Subjects

dc:subject × 1

Rights

dc:rights
Statement dc:rights
  • Nanyang Technological University

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10356/5301

Chain of custody

source
Harvested from
Nanyang Technological University
Base URL
dr.ntu.edu.sg/oai/request
Last updated
2026-11-27
Source record
OAI-PMH GetRecord
citation

Tng, Long Khim.. Improvement of production logistics for semiconductor backend manufacturing. 2004. https://hdl.handle.net/10356/5301