Back to search
Nanyang Technological University
Re-engineering supply chains for postponement strategy
Abstract
dc:description.abstractin this paper, it is emphasized that a broader view of supply chain management, so called “Extended Supply Chain Management” is adapted to integrate critical inbound and outbound, upstream and downstream logistics function throughout entire product manufacturing operation. Therefore, the design of supply chain network, especially the implementation of reengineering supply chains for postponement strategy.
Degree
thesis:*- College dc:contributor.school
- School of Mechanical and Production Engineering
- Year dc:date.issued
- 2002
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Zhou, Liang.
- Advisor dc:contributor.supervisor
-
- Jiao, Roger Jianxin
Subjects
dc:subject × 1Rights
dc:rights- Statement dc:rights
-
- Nanyang Technological University
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10356/5573