Back to search

Nanyang Technological University

Foundry production scheduling by Adexa in an oilfield service company

Abstract

dc:description.abstract

Production scheduling in company SLB requires significant manual planning power due to the large volume of work orders. SLB is looking for alternatives to replace manual planning with computer planning to save planning costs and realize its investment on Adexa. Adexa is a tool which can generate optimized production schedules for manufacturing companies. This thesis project studies the foundry production scheduling using Adexa in SLB. The available capacity for work centers and production process flows in foundry and stage machining are studied. Adexa model for foundry is built by defining the inputs of the work centers. The inputs are further fine-tuned based on the loading percentage calculations. A test case for foundry is designed to investigate the planning logic of Adexa in balancing the demand with supply. The result shows that Adexa’s planning logic matches the SLB’s manual planning logic. Lastly, results of trial runs of Adexa without capacity constraint are obtained. Feasible solutions are proposed to SLB for the identified implementation challenges of Adexa.

Degree

thesis:*
College dc:contributor.school
Nanyang Business School
Year dc:date.issued
2010

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Wang, Xiaojun
Advisor dc:contributor.supervisor
  • Rohit Bhatnagar

Subjects

dc:subject × 1

Rights

Language dc:language.iso
en

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10356/60583

Chain of custody

source
Harvested from
Nanyang Technological University
Base URL
dr.ntu.edu.sg/oai/request
Last updated
2026-11-27
Source record
OAI-PMH GetRecord
citation

Wang, Xiaojun. Foundry production scheduling by Adexa in an oilfield service company. 2010. https://hdl.handle.net/10356/60583