Back to search

Nanyang Technological University

Simulation based analysis on ways to improve the factory performance

Abstract

dc:description.abstract

An effective production strategy would lead to efficient production line performance as well as increased profit. However, there is no fixed or generalized solution. In this project, the author treat the n-job, two-stage hybrid flow line problem with 2 different machines in the first station and 7 identical machines in the second station. The objective for this project is to reducing the total cost. The author researched the ways to improve a company’s performance by reducing the total cost from four different aspects (Production batches, transfer batches, dedicated line as well as predetermining a shared product type). After this project, the total estimated saving for company will be S$18988.6 per 42 weeks, which is over 10% of total cost. The research is meaningful and can provide a guide for manufacturing industry.

Degree

thesis:*
College dc:contributor.school
School of Mechanical and Aerospace Engineering
Year dc:date.issued
2008

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Xie, Zhiyu
Advisor dc:contributor.supervisor
  • Appa Iyer Sivakumar

Subjects

dc:subject × 1

Rights

Language dc:language.iso
en

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10356/60667

Chain of custody

source
Harvested from
Nanyang Technological University
Base URL
dr.ntu.edu.sg/oai/request
Last updated
2026-11-27
Source record
OAI-PMH GetRecord
citation

Xie, Zhiyu. Simulation based analysis on ways to improve the factory performance. 2008. https://hdl.handle.net/10356/60667