Back to search

Nanyang Technological University

Design of a real-time process tracking system in a production cell

Abstract

dc:description.abstract

Company AFT needs a real-time process tracking system to monitor the key performance indicators (KPI) of its artificial lift gauge production cell to understand its production problems. In this project, six KPIs were identified, including inventory level, cycle time, overall production rate, utilization rate, first-time pass rate and process capability. A tracking system capable of obtaining relevant data was designed and programmed in Microsoft Access. The trial implementation had proven the functionality of the new tracking system. With regular data entry by the production team, the new system is able to capture important production parameters easily and display the information on a daily basis.

Degree

thesis:*
College dc:contributor.school
School of Mechanical and Aerospace Engineering
Year dc:date.issued
2009

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Zhang, Endong
Advisor dc:contributor.supervisor
  • Tor Shu Beng

Subjects

dc:subject × 1

Rights

Language dc:language.iso
en

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10356/60700

Chain of custody

source
Harvested from
Nanyang Technological University
Base URL
dr.ntu.edu.sg/oai/request
Last updated
2026-11-27
Source record
OAI-PMH GetRecord
citation

Zhang, Endong. Design of a real-time process tracking system in a production cell. 2009. https://hdl.handle.net/10356/60700