Scheduling manufacturing system with sequence dependent setup and maintenance

Abstract

dc:description.abstract

Few researches in scheduling literature have considered setup and maintenance concurrently. This thesis analyzes sequence-dependent setup scheduling problem with non-resumable case of maintenance consideration to minimize makespan (maximizing utilization) on a single machine. Some parts of machine time are required for setup and maintenance activity, and in this study it is assumed that these two can be performed simultaneously. The analysis is divided into three parts, based on its job arrival and maintenance period assumption. Algorithms with dynamic job arrival assumption are tested on historical data of an actual semiconductor testing facility system. It is observed that the proposed algorithms are able to improve machine productive utilization by up to ~6% and average WIP by up to --40%.

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Hendra Teja Wirawan
Advisors dc:contributor.supervisor
  • Sivakumar A. I.
  • Stephen Graves

Subjects

dc:subject × 1

Rights

Language dc:language.iso
en

Identifiers

dc:identifier.*
Dc Identifier Citation
Hendra Teja Wirawan. (2013). Scheduling manufacturing system with sequence dependent setup and maintenance. Doctoral thesis, Nanyang Technological University, Singapore.

Chain of custody

source
Harvested from
Nanyang Technological University
Base URL
dr.ntu.edu.sg/oai/request
Last updated
2026-11-27
Source record
OAI-PMH GetRecord
citation

Hendra Teja Wirawan. Scheduling manufacturing system with sequence dependent setup and maintenance. 2013. https://doi.org/10.32657/10356/64823