Back to search

Nanyang Technological University

Management of an underground MRT station construction

Abstract

dc:description.abstract

This report describes a study on the various forms of management tools used in the construction of an underground Mass Rapid Transit (MRT) station, the Chinatown Station. The construction of Chinatown Station is considered to be the most difficult amongst the 16 underground MRT stations on the North-East Line. Situated in the midst of "Chinatown"* this area is densely populated and is in one of the oldest parts of Singapore where a number of buildings are to be conserved. The station is located directly beneath two of the busiest roads in Singapore and between buildings that are within 2m from the station perimeter walls. Eu Tong Sen Canal runs between the roads and full flow capacity has to be maintained at all times. In addition, spanning across these roads and the canal sits the "Garden Bridge"", a majestic pedestrian overpass whose bored pile foundations pass through the proposed station box. This bridge will have to be supported and kept open to pedestrians at all times.

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Soh, Kin Meng.
Advisor dc:contributor.supervisor
  • Lim, Ewe Chye

Subjects

dc:subject × 1

Rights

dc:rights
Statement dc:rights
  • Nanyang Technological University

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10356/6590

Chain of custody

source
Harvested from
Nanyang Technological University
Base URL
dr.ntu.edu.sg/oai/request
Last updated
2026-11-27
Source record
OAI-PMH GetRecord
citation

Soh, Kin Meng.. Management of an underground MRT station construction. 2000. https://hdl.handle.net/10356/6590