Back to search

Nanyang Technological University

From design to practice-some issues on design and construction techniques for cut and cover tunnels in D&B projects

Abstract

dc:description.abstract

In this study, various design and construction methods (case studies) proposed at the interfaces with existing and future developments with respect to temporary and permanent structures in the Cut an Cover Tunnels for the Kallang Paya Lebar Expressway (KPE) and Marina Line (MRT) Design and Build projects are reviewed.

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Bolem Venkata Siva Rama Krishna Ravi Prasad
Advisor dc:contributor.supervisor
  • Wong, Wai Fan

Subjects

dc:subject × 1

Rights

dc:rights
Statement dc:rights
  • Nanyang Technological University

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10356/6689

Chain of custody

source
Harvested from
Nanyang Technological University
Base URL
dr.ntu.edu.sg/oai/request
Last updated
2026-11-27
Source record
OAI-PMH GetRecord
citation

Bolem Venkata Siva Rama Krishna Ravi Prasad. From design to practice-some issues on design and construction techniques for cut and cover tunnels in D&B projects. 2003. https://hdl.handle.net/10356/6689