Back to search
Nanyang Technological University
From design to practice-some issues on design and construction techniques for cut and cover tunnels in D&B projects
Abstract
dc:description.abstractIn this study, various design and construction methods (case studies) proposed at the interfaces with existing and future developments with respect to temporary and permanent structures in the Cut an Cover Tunnels for the Kallang Paya Lebar Expressway (KPE) and Marina Line (MRT) Design and Build projects are reviewed.
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Bolem Venkata Siva Rama Krishna Ravi Prasad
- Advisor dc:contributor.supervisor
-
- Wong, Wai Fan
Subjects
dc:subject × 1Rights
dc:rights- Statement dc:rights
-
- Nanyang Technological University
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10356/6689