Back to search

North Dakota State University

Performance of a Retrofit Detention Basin in Fargo, ND

Abstract

dc:description.abstract

“The Fargo Project” located in Fargo, North Dakota, is an 18-acre stormwater detention basin that was retrofitted in 2015 to include an earthen-channel, sediment forebay, and various native vegetation within the floodplain and channels. Goals of this study were to assess how the post-retrofit earthen-channel performs relative to the pre-retrofit concrete-channel in terms of conveyance of small storms, and to estimate infiltration and evaporation from the post-retrofit detention basin during various storm sizes and intensities. Results showed that although channel roughness ultimately increased in the post-retrofit basin and allowed for greater instances of flooding for one channel, erosion of the main channel, with a larger urbanized contributing area, resulted in behavior similar to that of the pre-retrofit main channel for small storms. Modeled infiltration and evaporation showed total abstraction ranging between 2.9% and 11.7% of the maximum ponded volume for various storm sizes and intensities.

Degree

thesis:*
Grantor dc:publisher
North Dakota State University
Year dc:date.issued
2019

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Huggins, Cole Patrick

Rights

dc:rights
Statement dc:rights
  • NDSU policy 190.6.2

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10365/31576

Chain of custody

source
Harvested from
North Dakota State University
Base URL
library.ndsu.edu/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Huggins, Cole Patrick. Performance of a Retrofit Detention Basin in Fargo, ND. North Dakota State University, 2019. https://hdl.handle.net/10365/31576