Conceptual Cost Estimation Models for Bridge Projects

Abstract

dc:description.abstract

Conceptual cost estimating is typically completed early in the project lifecycle when little design work has been completed. Because little information is known at this early stage, the estimate usually deviates substantially from the actual construction cost. Therefore, the objective of this research is to develop a conceptual cost estimate model for bridge infrastructure projects. In this study, a systematic literature review and meta-analysis of Mean Average Percentage Errors (MAPEs) of cost models was undertaken to identify the various cost estimation methods, the input variables that have adopted in the development of models and determine the impact of cost estimation method on the accuracy of cost prediction. The research study utilized regression analysis, decision tree and random forest methods for cost prediction of Wisconsin bridges. A comparison of the three models that were developed revealed that random forest cost estimation method yielded better cost prediction.

Degree

thesis:*
Grantor dc:publisher
North Dakota State University
Year dc:date.issued
2021

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Essegbey, Adikie Esinam

Rights

dc:rights
Statement dc:rights
  • NDSU policy 190.6.2

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10365/32630

Chain of custody

source
Harvested from
North Dakota State University
Base URL
library.ndsu.edu/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Essegbey, Adikie Esinam. Conceptual Cost Estimation Models for Bridge Projects. North Dakota State University, 2021. https://hdl.handle.net/10365/32630