Back to search

North Dakota State University

Phasor Measurement Unit Placements for Complete Observability using Linear-Time, Quadratic-Time, and Subquadratic-Time Heuristics

Abstract

dc:description.abstract

A phasor measurement unit (PMU) is considered to have the potential to improve the efficiency of electric power systems by monitoring, control, and protection. Through measurements of all bus voltages, incoming and outgoing currents, and by subsequent calculation of all phase angles, employing PMUs on every substation in a power system will allow complete observation of a power system. However, having a PMU on every substation may not be economically feasible. Therefore, methodologies must be devised that can monitor a system with the minimum possible number of PMUs. In this paper, we propose six graph theoretical PMU placement heuristics. The proposed heuristics overcome the previous approaches in terms of scalability and execution time. The proposed heuristics are thoroughly compared and benchmarked using standard IEEE bus networks ranging from 14 to 300 buses, and a 2,383 bus system.

Degree

thesis:*
Grantor dc:publisher
North Dakota State University
Year dc:date.issued
2010

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Saula, Oluwasijibomi

Subjects

dc:subject × 3

Rights

dc:rights
Statement dc:rights
  • NDSU policy 190.6.2

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10365/33624

Chain of custody

source
Harvested from
North Dakota State University
Base URL
library.ndsu.edu/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
citation

Saula, Oluwasijibomi. Phasor Measurement Unit Placements for Complete Observability using Linear-Time, Quadratic-Time, and Subquadratic-Time Heuristics. North Dakota State University, 2010. https://hdl.handle.net/10365/33624