University of Nebraska
THE EFFECT OF SYSTEM OPERATION DURATION ON FAILURE RATE: A STUDY OF STRATEGIC AIRLIFT AIRCRAFT
Abstract
dc:description.abstractThe level of stress experienced during system turn-on was hypothesized to be greater than the stress level of steady-state operation. This fixed plus variable approach to the cause of failure permitted the isolation of the steady-state stress. Some 85,000 C-5 and 840,000 C-141 strategic airlift aircraft missions were analyzed using flight length as the independent variable. A one hour temporal adjustment of flight length was made for the takeoff and landing phases of flight. The equation Y = a + b(x-1)/X provided and x of 0.99 for both aircraft. Thus, the average failure rate decreases as system operation duration increases.
Degree
thesis:*- Name thesis:degree_name
- Ph.D.
- Level thesis:degree_level
- Dissertation
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- SHAW, CHRISTOPHER CAMPBELL
Identifiers
dc:identifier.*- Repository record dc:identifier
- https://digitalcommons.unl.edu/dissertations/AAI8228159