Abstract
dc:description.abstractA Flexible Manufacturing System (FMS) consisting of p automated guided vehicles (AGV's), m workstations and n tasks is studied. The main problem investigated in this thesis is to find an optimal or suboptimal task scheduling for p AGV's among m workstations to complete n tasks. An efficient approach based on genetic algorithms has been designed and implemented to solve the problem of task scheduling for a FMS. Near-optimal, or even optimal, task scheduling is accomplished by genetic algorithms. Simulation results on the algorithm are also discussed.
Degree
thesis:*- Name thesis:degree_name
- Master of Science in Electrical Engineering - (M.S.)
- Discipline thesis:degree_discipline
- Electrical and Computer Engineering
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Li, Hung-Yuan
- Contributors dc:contributor
-
- Edwin Hou
- Anthony D. Robbi
- Nirwan Ansari
Subjects
dc:subject × 4Identifiers
dc:identifier.*- Repository record dc:identifier
- https://digitalcommons.njit.edu/theses/1295