Back to search
University of North Dakota
Obtaining a Solution to why the Witteman No. 1 Well failed and applying this solution to the new well Clifford #43-35-R Well
Abstract
dc:description.abstractt The objective of this project is to investigate the cause of casing failure in Witteman No. 1 and to apply the findings to design a solution for preventing similar occurrence in the twin wells that are planned to be drilled in the area.
Degree
thesis:*- Name thesis:degree_name
- Bachelor of Science (BS)
- Level thesis:degree_level
- Senior Project
- Discipline thesis:degree_discipline
- Geological Engineering
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Hegle, Lloyd
Identifiers
dc:identifier.*- Repository record dc:identifier
- https://commons.und.edu/senior-projects/130