Monterey, CA; Naval Postgraduate School
Cost benefit analysis of pier refueling versus barge refueling at the Fleet Industrial Supply Center Fuel Facility Pearl Harbor, Hawaii
Abstract
dc:description.abstractThe purpose of this MBA project was to complete a cost-benefit analysis of refueling via pipeline versus refueling via barge at Pearl Harbor, Hawaii. The alternatives are (1) refueling via a combination of pipeline and barge (status quo), (2) refueling via a single pipeline, and (3) refueling via barge only. The objective was to compare the three alternatives, choosing that alternative that provides the greater net benefit and most efficient use of resources. The analysis involved data collection of labor costs, pipeline operations (flow rates data, costs of repairs, and operational costs), barge operational costs, and environmental protection costs. This Cost Benefit Analysis (CBA) will be valuable to personnel with approval authority who make decisions on the merits of future pipeline projects. This CBA can be used to evaluate other Navy bases' refueling operations worldwide.
Degree
thesis:*- Name thesis:degree_name
- Master of Business Administration
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Business Administration
- Grantor dc:publisher
- Monterey, CA; Naval Postgraduate School
- Year dc:date.issued
- 2003
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Drake, Roy
- Advisors dc:contributor.advisor
-
- Franck, Raymond
- Eaton, Donald
Subjects
dc:subject × 3Rights
dc:rights- Statement dc:rights
-
- This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
- Approved for public release; distribution is unlimited.
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10945/1000