Back to search

Monterey, CA; Naval Postgraduate School

Cost benefit analysis of pier refueling versus barge refueling at the Fleet Industrial Supply Center Fuel Facility Pearl Harbor, Hawaii

Abstract

dc:description.abstract

The purpose of this MBA project was to complete a cost-benefit analysis of refueling via pipeline versus refueling via barge at Pearl Harbor, Hawaii. The alternatives are (1) refueling via a combination of pipeline and barge (status quo), (2) refueling via a single pipeline, and (3) refueling via barge only. The objective was to compare the three alternatives, choosing that alternative that provides the greater net benefit and most efficient use of resources. The analysis involved data collection of labor costs, pipeline operations (flow rates data, costs of repairs, and operational costs), barge operational costs, and environmental protection costs. This Cost Benefit Analysis (CBA) will be valuable to personnel with approval authority who make decisions on the merits of future pipeline projects. This CBA can be used to evaluate other Navy bases' refueling operations worldwide.

Degree

thesis:*
Name thesis:degree_name
Master of Business Administration
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Business Administration
Grantor dc:publisher
Monterey, CA; Naval Postgraduate School
Year dc:date.issued
2003

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Drake, Roy
Advisors dc:contributor.advisor
  • Franck, Raymond
  • Eaton, Donald

Subjects

dc:subject × 3

Rights

dc:rights
Statement dc:rights
  • This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
  • Approved for public release; distribution is unlimited.

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10945/1000

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
citation

Drake, Roy. Cost benefit analysis of pier refueling versus barge refueling at the Fleet Industrial Supply Center Fuel Facility Pearl Harbor, Hawaii. Masters thesis, Monterey, CA; Naval Postgraduate School, 2003. https://hdl.handle.net/10945/1000