Back to search

Monterey, CA; Naval Postgraduate School

Analysis of design-build processes, best practices, and applications to the Department of Defense

Abstract

dc:description.abstract

The Federal Government's preference for the acquisition of commercial items was placed into law under Public Law 103-355, Federal Acquisition Streamlining Act of 1994. Acquisition policies were established that more closely resembled those of the commercial marketplace and the law encouraged the acquisition of commercial supplies and services. This law did not extend to the acquisition of design-build construction. Acquisition policy regarding Government design-build should be analyzed to determine which best commercial processes/practices may be applied to the acquisition of Government design-build. Design- Build (DB) is defined as a project delivery system in which the owner contracts with, and holds responsible, one single entity for both design and construction of a project. This method differs from the traditional design-bid-build (DBB) approach in which the owner contracts with an architect to design the project (prepare drawings and specifications) under a design contract and then competitively bids the project among construction contractors to build the facility. With NAVFAC's mandate, that by the end of Fiscal Year (FY) 07, 75% of capital improvement projects above $7 50,000 will be accomplished by design-build acquisition, it is imperative that we look into utilizing non-DoD design-build processes/practices to allow flexibility, creativity and innovativeness in design approach; take advantage of time-savings; and complete projects within cost. In order to achieve this goal NAVFAC strategy is to ensure the most efficient business processes are in place (Reference Capital Improvements Business Line, Design-Build Policy and Guidelines). The purpose of this research is to examine current non-DoD design build processes, determine best practices, analyze the application of these best practices to the award and administration of DoD, specifically NAVFAC, design-build contracts and provide recommendations.

Degree

thesis:*
Name thesis:degree_name
Master of Business Administration
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Business Administration
Grantor dc:publisher
Monterey, CA; Naval Postgraduate School
Year dc:date.issued
2006

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Cantrell, Kim S.
Advisors dc:contributor.advisor
  • Rendon, Rene G.
  • Cuskey, Jeffrey R.

Rights

dc:rights
Statement dc:rights
  • This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
  • Distribution Statement A. Approved for public release: Distribution is unlimited.

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10945/10123

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Cantrell, Kim S.. Analysis of design-build processes, best practices, and applications to the Department of Defense. Masters thesis, Monterey, CA; Naval Postgraduate School, 2006. https://hdl.handle.net/10945/10123