Monterey, CA; Naval Postgraduate School
The challenges associated with accounting for the Army's Force Provider System when deployed in support of military operations
Abstract
dc:description.abstractThe objective of this project is to research and analyze the consequences of deploying an end item system consisting of a myriad of components that have warfighter utility outside of the Force Provider (FP) system design. The analysis will address the inherent challenges associated with accountability of the FP System when deployed and decommissioned to undergo RESET, the lack of a singular management and decision-making authority to control the system from production through deployment, and the financial implications that occur when the integrity of the FP System is lost due to re-distribution of major components throughout the battlefield. As a result of this project, the FP product office, Army leadership and the using organizations will all understand the necessity to maintain complete accountability and integrity of the FP System throughout its deployment and decommissioning cycle. This may also result in decisions that could minimize the financial burden to the Army due to components that are lost to operational commanders who decide to keep some FP components, which must be reprocured for RESET.
Degree
thesis:*- Name thesis:degree_name
- Master of Science in Program Management
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Contract Management
- Grantor dc:publisher
- Monterey, CA; Naval Postgraduate School
- Year dc:date.issued
- 2008
Author and committee
dc:creator, dc:contributor.*- Authors dc:creator
-
- Stewardson, Donald
- Correia, Carlos
- Horner, Allen
- McLaughlin, James
- Advisors dc:contributor.advisor
-
- Naegle, Brad R.
- Simon, Cary
Rights
dc:rights- Statement dc:rights
-
- Copyright is reserved by the copyright owner.
- Approved for public release; distribution is unlimited.
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10945/10373