Back to search

Rensselaer Polytechnic Institute

The evaluation of a central heating system for a government facility

Abstract

dc:description.abstract

The purpose of this paper is to evaluate an existing government owned and operated central heating system to determine if a more economical method of providing steam requirements can be determined. Five possible solutions are considered. Through cost comparison, the most economic solution is determined, first on the basis of total cost to own and operate, and then on the basis of cost to operate only. The most economic solution is the operation of the existing system with a reduction of personnel.

Degree

thesis:*
Name thesis:degree_name
M.S. in Mechanical Engineering
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Mechanical Engineering
Grantor dc:publisher
Rensselaer Polytechnic Institute
Year dc:date.issued
1960

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Burns, William J.

Subjects

dc:subject × 1

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10945/12120

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-11-20
Source record
OAI-PMH GetRecord
citation

Burns, William J.. The evaluation of a central heating system for a government facility. Masters thesis, Rensselaer Polytechnic Institute, 1960. https://hdl.handle.net/10945/12120