Back to search
Rensselaer Polytechnic Institute
The evaluation of a central heating system for a government facility
Abstract
dc:description.abstractThe purpose of this paper is to evaluate an existing government owned and operated central heating system to determine if a more economical method of providing steam requirements can be determined. Five possible solutions are considered. Through cost comparison, the most economic solution is determined, first on the basis of total cost to own and operate, and then on the basis of cost to operate only. The most economic solution is the operation of the existing system with a reduction of personnel.
Degree
thesis:*- Name thesis:degree_name
- M.S. in Mechanical Engineering
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Mechanical Engineering
- Grantor dc:publisher
- Rensselaer Polytechnic Institute
- Year dc:date.issued
- 1960
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Burns, William J.
Subjects
dc:subject × 1Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10945/12120