Back to search

Monterey, CA; Naval Postgraduate School

Cost-constrained project scheduling with task durations and costs that may increase over time: demonstrated with the U.S. Army future combat systems

Abstract

dc:description.abstract

We optimize long-term project schedules subject to annual budget constraints, where the duration and cost of each task may increase as the project progresses. Initially, tasks are scheduled without regard to budgets and the project completion time is minimized. Treating the task durations as random variables, we then use simulation to describe the distribution of the project completion time. Next, we minimize the completion time under budget constraints with fixed task durations, where budget violations are tolerated albeit with penalties. Annual reviews are then introduced, which allow underway tasks to be delayed or monthly budgets to be increased. We obtain estimates of the completion time of the project and its final cost under each of these scenarios. The U.S. Army Future Combat Systems (FCS) is used for illustration. FCS is a suite of information technologies, sensors, and command systems with an estimated acquisition cost of over $90 billion. The U.S. General Accounting Office found that FCS is at risk of substantial cost overrun and delay. We analyze three schedule plans for FCS to identify which can be expected to deliver the earliest completion time and the least cost.

Degree

thesis:*
Name thesis:degree_name
M.S. in Operations Research
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Operations Research
Department dc:contributor.department
Department of Operations Research
Grantor dc:publisher
Monterey, CA; Naval Postgraduate School
Year dc:date.issued
2004

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Grose, Roger T.
Advisors dc:contributor.advisor
  • Koyak, Robert A.
  • Brown, G.

Subjects

dc:subject × 2

Rights

dc:rights
Statement dc:rights
  • Copyright is reserved by the copyright owner.
  • Approved for public release; distribution is unlimited.

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10945/1582

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
citation

Grose, Roger T.. Cost-constrained project scheduling with task durations and costs that may increase over time: demonstrated with the U.S. Army future combat systems. Masters thesis, Monterey, CA; Naval Postgraduate School, 2004. https://hdl.handle.net/10945/1582