Monterey, California. Naval Postgraduate School
A model for Marine Corps engineer planning.
Abstract
dc:description.abstractGiven an engineer force structure and a set of projects to be completed in a specified time period by the units of the force structure, the problem which is examined is that of efficient utilization of the excess labor in some skills which is likely to be available after completion of the minimum number of projects. A model is developed in terms of a vector maximization problem. This is reduced to a linear programming problem, which is further reduced to a problem which can be solved by algebraic means. A test problem is run and results presented. A suggestion for an additional use of the model is included.
Degree
thesis:*- Name thesis:degree_name
- M.S. in Operations Research
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Operations Research
- Department dc:contributor.department
- Operations Research and Administrative Sciences
- Grantor dc:publisher
- Monterey, California. Naval Postgraduate School
- Year dc:date.issued
- 1972
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Harrison, John Carrell.
- Advisor dc:contributor.advisor
-
- Capra, James R.
Rights
dc:rights- Statement dc:rights
-
- This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
- Approved for public release; distribution is unlimited.
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10945/16254