Back to search

Monterey, California. Naval Postgraduate School

A model for Marine Corps engineer planning.

Abstract

dc:description.abstract

Given an engineer force structure and a set of projects to be completed in a specified time period by the units of the force structure, the problem which is examined is that of efficient utilization of the excess labor in some skills which is likely to be available after completion of the minimum number of projects. A model is developed in terms of a vector maximization problem. This is reduced to a linear programming problem, which is further reduced to a problem which can be solved by algebraic means. A test problem is run and results presented. A suggestion for an additional use of the model is included.

Degree

thesis:*
Name thesis:degree_name
M.S. in Operations Research
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Operations Research
Department dc:contributor.department
Operations Research and Administrative Sciences
Grantor dc:publisher
Monterey, California. Naval Postgraduate School
Year dc:date.issued
1972

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Harrison, John Carrell.
Advisor dc:contributor.advisor
  • Capra, James R.

Rights

dc:rights
Statement dc:rights
  • This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
  • Approved for public release; distribution is unlimited.

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10945/16254

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-11-20
Source record
OAI-PMH GetRecord
related terms
citation

Harrison, John Carrell.. A model for Marine Corps engineer planning.. Masters thesis, Monterey, California. Naval Postgraduate School, 1972. https://hdl.handle.net/10945/16254