Monterey, California. Naval Postgraduate School
The applicability of should cost to the procurement process
Abstract
dc:description.abstractAs major weapons systems become more complex, it becomes increasingly more difficult to accurately estimate the cost. Various costing techniques have been utilized in an attempt to accurately estimate the contract price of modern weapon systems with varying degrees of success. "Should cost" analysis has become increasingly more important, in the eyes of some, as the best approach in a noncompetitive procurement situation. Currently, the Army, the Air Force, the Navy and GAO all conduct "should cost" studies using various approaches. In this paper, an attempt is made to gain the feelings of Defense contractors concerning the application of government "should cost" analysis. The author of this paper has made several recommendations, based upon data available, concerning the limitations of and the application of "should cost" analysis.
Degree
thesis:*- Name thesis:degree_name
- M.S. in Management
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Management
- Department dc:contributor.department
- Operations Research and Administrative Sciences
- Grantor dc:publisher
- Monterey, California. Naval Postgraduate School
- Year dc:date.issued
- 1974
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Haight, Richard William
- Advisor dc:contributor.advisor
-
- Zabrycki, Edward A.
- Committee member dc:contributor.committeemember
-
- Judson, Robert R.
Subjects
dc:subject × 1Rights
dc:rights- Statement dc:rights
-
- This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
- Approved for public release; distribution is unlimited.
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10945/16889