Back to search

University of Texas at Austin

An empirical comparison of design/build and design/bid/build project delivery methods

Abstract

dc:description.abstract

This thesis project compares the performance of a homogeneous sample of United States Navy Bachelor Enlisted Quarters built using the Military Construction process. Projects will be broken into two sub-samples of design/bid/build and design/build projects to see if one project delivery method is superior in regards to time and cost. Project duration, project duration per bed, project time growth, cost growth and cost per bed will be statistically compared. Upon completion of the analysis the hypothesis that design/build projects are superior to design/bid/build projects in regards to time and cost will be tested.

Degree

thesis:*
Name thesis:degree_name
Master of Science in Engineering
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Engineering
Grantor dc:publisher
University of Texas at Austin
Year dc:date.issued
2005

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Hale, Darren Russell.

Rights

dc:rights
Statement dc:rights
  • This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10945/1722

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Hale, Darren Russell.. An empirical comparison of design/build and design/bid/build project delivery methods. Masters thesis, University of Texas at Austin, 2005. https://hdl.handle.net/10945/1722