Monterey, California. Naval Postgraduate School
Funding considerations for material managed by the Naval Electronic System Command
Abstract
dc:description.abstractThe Naval Electronic Systems Command's (NAVELEX) ability to satisfy unfunded, unplanned requirement demands for 2Z cognizance material has theoretically been impaired due to the budgetary exclusion of funds with which to replace attrited assets. This study considers the primary factors which have caused this funding requirement to be excluded from the budget. Factors such as the Chief of Naval Operations (CNO) definition of principal and secondary items, Stock Coordination Program policies, actual inventory item characteristics, and inventory management practices, were reviewed. This study concludes that NAVELEX should submit a budget request for the funds required, that CNO's definition of principal and secondary items should be revised, that the current Stock Coordination Program criteria for Hardware Systems Commands to manage material should be retained, and that the Stock Coordination Program should continue to be supported by NAVELEX.
Degree
thesis:*- Name thesis:degree_name
- M.S. in Management
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Management
- Department dc:contributor.department
- Administrative Sciences
- Grantor dc:publisher
- Monterey, California. Naval Postgraduate School
- Year dc:date.issued
- 1979
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Lynn, Gary D.
- Advisor dc:contributor.advisor
-
- McMasters, Alan W.
- Committee member dc:contributor.committeemember
-
- Sagehorn, R.W.
Subjects
dc:subject × 1Rights
dc:rights- Statement dc:rights
-
- Approved for public release; distribution is unlimited.
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10945/18734