Naval Postgraduate School
A model for evaluating vendor bids for stock replenishment of an item.
Abstract
dc:description.abstractThe Ships Parts Control Center (SPCC) Uniform Inventory Control Program (UICP) wholesale replenishment model for 1H cognizance symbol (consumable) material is an order quantityreorder level or (Q,r) model. A stocked item's order quantity and reorder level are established in large part by the unit price and procurement lead time forecasted for it. When a replenishment is needed, the order quantity is specified and the procurement officer requests bids from vendors. These bids include both a unit price and an estimate of production lead time. The thesis examines the impact of differences between the forecasted and actual values for lead time apd price on the optimum total annual cost of stocking the item as computed by the UICP model. A modification of the model for comparison of the total annual cost associated with the lead time and price combination of each vendor bid is developed. Some expected effects of implementing the model are discussed and areas requiring further research are identified.
Degree
thesis:*- Name thesis:degree_name
- M.S. in Management
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Management
- Department dc:contributor.department
- Administrative Sciences
- Grantor
- Naval Postgraduate School
- Year dc:date.issued
- 1984
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Gray, Richard D.
- Advisor dc:contributor.advisor
-
- McMasters, Alan W.
- Committee member dc:contributor.committeemember
-
- Solis, Armando R.
Subjects
dc:subject × 1Rights
dc:rights- Statement dc:rights
-
- This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
- Approved for public release; distribution is unlimited.
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10945/19453