Monterey, California. Naval Postgraduate School
The warranty guaranty clause: an analysis of its use on the Spruance class (DD-963) shipbuilding contract and identification of lessons learned
Abstract
dc:description.abstractThe extension of contractor liability beyond delivery is an essential element in contracting when complex weapons systems are involved. Warranty/Guaranty clauses are currently being included in shipbuilding contracts as a means of incentivizing contractors to provide quality workmanship and materials. The authors have investigated the results of one Warranty/Guaranty effort, the U.S. Navy's Spruance Class Shipbuilding Program, and constructed a Cost-Effectiveness Model to evaluate actual performance on three ships of that Class. Lessons learned are identified and presented which could be incorporated into future Warranty/Guaranty policy decisions.
Degree
thesis:*- Name thesis:degree_name
- M.S. in Management
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Management
- Department dc:contributor.department
- Administrative Sciences
- Grantor dc:publisher
- Monterey, California. Naval Postgraduate School
- Year dc:date.issued
- 1983
Author and committee
dc:creator, dc:contributor.*- Authors dc:creator
-
- Freihofer, James T.
- Beach, Daniel S.
- Advisor dc:contributor.advisor
-
- Boger, D.C.
- Committee member dc:contributor.committeemember
-
- Bergquist, John R.
Subjects
dc:subject × 1Rights
dc:rights- Statement dc:rights
-
- This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
- Approved for public release; distribution is unlimited.
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10945/20033