A multi-resource leveling algorithm for project networks.
Abstract
dc:description.abstractThis thesis presents a modification and extension to the Burgess and Killebrew heuristic resource leveling procedure for project networks. In contrast to previous algorithms appearing in the literature, the objective function of this algorithm is the minimization of the sum of the squared errors in each time period (deviations around the mean usage) of all resources over the duration of the project. This objective function continues the search for an improved schedule beyond that of previous algorithms with their associated objective functions. One important feature is that the algorithm tends to reduce the number of periods that a resource is idle during its duration on the project.
Degree
thesis:*- Name thesis:degree_name
- M.S. in Operations Research
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Operations Research
- Department dc:contributor.department
- Operations Research and Administrative Sciences
- Grantor dc:publisher
- Monterey, California. Naval Postgraduate School
- Year dc:date.issued
- 1975
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Lee, ChungUng
- Advisor dc:contributor.advisor
-
- McMasters, Alan W.
- Committee member dc:contributor.committeemember
-
- Howard, Gilbert T.
Rights
dc:rights- Statement dc:rights
-
- Copyright is reserved by the copyright owner
- Approved for public release; distribution is unlimited.
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10945/20958