Back to search

Washington, D.C. : AEI Press

An analysis of impediments to the productivity enhancing capital investment programs at the Naval Air Station, Alameda and the Naval Air Rework Facility, Alameda, California.

Abstract

dc:description.abstract

This thesis evaluates the impediments to the productivity enhancing capital investment programs to two Naval Activities, Naval Air Station Alameda, and Naval Air Rework Facility, Alameda, California. The analysis uses a management control perspective. Particular issues addressed are what productivity programs are currently being used and why some programs are not yet fully functioning. In examining the productivity programs it was found that certaim barriers do exist that impede the full utiilization of these programs. The work concludes with the listing of these impediments and recommendations for improving the programs. Keywords: PIP(Productivity Improvement Program); and ACP(Asset Compitalization Program).

Degree

thesis:*
Name thesis:degree_name
M.S. in Management
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Management
College dc:contributor.school
Naval Postgraduate School (U.S.)
Grantor dc:publisher
Washington, D.C. : AEI Press
Year dc:date.issued
1985

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Badger, Carlos S.
Advisors dc:contributor.advisor
  • Boger, D.C.
  • Euske, K. J.

Subjects

dc:subject × 1

Rights

dc:rights
Statement dc:rights
  • This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
  • Approved for public release; distribution is unlimited.

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10945/21147

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-11-21
Source record
OAI-PMH GetRecord
related terms
citation

Badger, Carlos S.. An analysis of impediments to the productivity enhancing capital investment programs at the Naval Air Station, Alameda and the Naval Air Rework Facility, Alameda, California.. Masters thesis, Washington, D.C. : AEI Press, 1985. https://hdl.handle.net/10945/21147