Monterey, California; Naval Postgraduate School
A model of lease versus buy in federal government construction decisions
Abstract
dc:description.abstractThis thesis examines the interaction of cash flows in the construction and operations of child care centers. The cash flows under government operation are examined and compared with the cash flows were the center operated by a private contractor under a lease agreement. Background concerning general public and private leasing agreements is provided. For the cash flow analysis a net present value model is generated using a commercial interactive computer program. Sensitivity analysis by varying input parameters and risk analysis utilizing Monte Carlo simulation are performed.
Degree
thesis:*- Name thesis:degree_name
- M.S. in Operations Research
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Operations Research
- Department dc:contributor.department
- Department of Operations Research
- Grantor dc:publisher
- Monterey, California; Naval Postgraduate School
- Year dc:date.issued
- 1985
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Bentler, Jerome F.
- Advisor dc:contributor.advisor
-
- Boger, Dan C.
- Committee member dc:contributor.committeemember
-
- Sovereign, Michael G.
Subjects
dc:subject × 1Rights
dc:rights- Statement dc:rights
-
- This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
- Approved for public release; distribution is unlimited.
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10945/21445