Naval Postgraduate School
An analysis of P-3 Aircraft Service Period Adjustment criteria
Abstract
dc:description.abstractLogisticians at NARF's (Naval Air Rework Facilities) presently rely on the qualitative judgment of skilled P & E's (Planners and Estimators) to determine when depot level maintenance is required on P-3 aircraft. This thesis focuses on quantifying the management problem of deciding which P-3's to recommend for rework delays under the Navy's ASPA (Aircraft Service Period Adjustment) program. Inspection consistency, precise managerial auditing, and computer-based trend analysis are prospective attributes of a properly tested and instituted quantitative ASPA evaluation. The engineering basis and the economic realities of the P & E's decision are addressed. By exploring current management science methodologies, a practical model patterned after ASPA evaluation methods being tested at NARF Norfolk and at Army Helicopter Depot Corpus Christi is recommended to assist NARF management with this decision
Degree
thesis:*- Name thesis:degree_name
- M.S. in Management
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Management
- Department dc:contributor.department
- Administrative Sciences
- Grantor
- Naval Postgraduate School
- Year dc:date.issued
- 1986
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Ash, William E.
- Advisor dc:contributor.advisor
-
- McMasters, Alan W.
- Committee member dc:contributor.committeemember
-
- Baumgartner, William E.
Subjects
dc:subject × 1Rights
dc:rights- Statement dc:rights
-
- This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
- Approved for public release; distribution is unlimited.
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10945/21656