Naval Postgraduate School
Cost benefit analysis of installing a Recovery Exercise Module (REM)--in a cruise missile for an operational test launch
Abstract
dc:description.abstractThis thesis provides a cost benefit analysis of installing a Recovery Exercise Module (REM ) in a Cruise Missile for an Operational Test Launch. Topics considered include: Should the Cruise Missile Project Office (CMPO) continue development of a new redesigned REM; should all test missiles be intentionally destroyed or should the REM be utilized; can the Non-Tactical Instrumentation Kit (NTIK), being developed for the Air Force be a cost effective test procedure for the Sea Launched Cruise Missile? The conclusion that was reached is that the CMPO should maintain use of the current REM model and cancel plans to redesign the REM. Additionally, REM production and test missile refurbishment should be competed, between several contractors. b e twee n sev e ral
Degree
thesis:*- Name thesis:degree_name
- M.S. in Management
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Management
- Department dc:contributor.department
- Administrative Sciences
- Grantor
- Naval Postgraduate School
- Year dc:date.issued
- 1987
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Glassman, Howard Elliott
- Advisor dc:contributor.advisor
-
- Boger, Dan C.
- Committee member dc:contributor.committeemember
-
- Matthews, Danny
Subjects
dc:subject × 1Rights
dc:rights- Statement dc:rights
-
- This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
- Approved for public release; distribution is unlimited.
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10945/22706