Back to search

Monterey, California : Naval Postgraduate School

Cost estimating relationship associating engineering drawing quality with installation cost growth for USN ship alterations

Abstract

dc:description.abstract

This is an analysis of existing feedback in the Fleet Modernization Program (FMP) planning and design process using the FFG-7 class of ships as a case study. This analysis attempts to relate the engineering drawing revision rate (inverse measure of drawing quality) and the number of ships affected by those drawing revisions (measure of availability concurrence) to the cost growth attributable to the FMP portion of U.S. Navy ship availabilities. Due to the lack of actual cost data, budget estimates were used as a surrogate and unfortunately firm relationships could not be established. However, the methodology developed has potential for application to any large ship class which may experience numerous concurrent availabilities, as actual cost data become available. It is meant to be a tool for the engineering design agent to assess the financial impact of the quality of engineering design products on the installing activities and to assess the potential value of policy changes which improve the quality of those products. Keywords: Data bases, Theses, Regression statistics. (KR)

Degree

thesis:*
Name thesis:degree_name
M.S. in Operations Research
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Operations Research
Grantor dc:publisher
Monterey, California : Naval Postgraduate School
Year dc:date.issued
1988

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Willstatter, Kurt
Advisor dc:contributor.advisor
  • Boger, Dan C.

Subjects

dc:subject × 1

Identifiers

dc:identifier.*
OCLC
ocm81839706

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-11-20
Source record
OAI-PMH GetRecord
citation

Willstatter, Kurt. Cost estimating relationship associating engineering drawing quality with installation cost growth for USN ship alterations. Masters thesis, Monterey, California : Naval Postgraduate School, 1988. https://hdl.handle.net/10945/22998