Back to search

Naval Postgraduate School

The effect of the covariance factor on the Procurement Problem Variance of net leadtime demand

Abstract

dc:description.abstract

An analysis is made of the formulae used by the Navy's Inventory Control Points in calculating the variance of Net Leadtime Demand of repairable items. A new formula is then derived, which makes use of actual calculations of covariance between regenerations and demands. The resulting variance values derived from the new formula are compared with the variance values resident on the Navy's Ships Parts Control Center data base and are shown to produce lower variances. The new formula is also compared to the option path formula to determine which formula produces the smallest variance. The comparison suggests an under-estimation of variance results when the option path with its estimate of the covariance is used. The thesis concludes with recommendations for implementation of the new formula.

Degree

thesis:*
Name thesis:degree_name
M.S. in Operations Research
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Operations Research
Department dc:contributor.department
Operations Research
Grantor
Naval Postgraduate School
Year dc:date.issued
1988

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Adams, Keith T.
Advisors dc:contributor.advisor
  • McMasters, Alan W.
  • Read, Robert R.

Rights

dc:rights
Statement dc:rights
  • Approved for public release; distribution is unlimited.

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10945/23190

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-11-20
Source record
OAI-PMH GetRecord
related terms
citation

Adams, Keith T.. The effect of the covariance factor on the Procurement Problem Variance of net leadtime demand. Masters thesis, Naval Postgraduate School, 1988. https://hdl.handle.net/10945/23190