Naval Postgraduate School
The effect of the covariance factor on the Procurement Problem Variance of net leadtime demand
Abstract
dc:description.abstractAn analysis is made of the formulae used by the Navy's Inventory Control Points in calculating the variance of Net Leadtime Demand of repairable items. A new formula is then derived, which makes use of actual calculations of covariance between regenerations and demands. The resulting variance values derived from the new formula are compared with the variance values resident on the Navy's Ships Parts Control Center data base and are shown to produce lower variances. The new formula is also compared to the option path formula to determine which formula produces the smallest variance. The comparison suggests an under-estimation of variance results when the option path with its estimate of the covariance is used. The thesis concludes with recommendations for implementation of the new formula.
Degree
thesis:*- Name thesis:degree_name
- M.S. in Operations Research
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Operations Research
- Department dc:contributor.department
- Operations Research
- Grantor
- Naval Postgraduate School
- Year dc:date.issued
- 1988
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Adams, Keith T.
- Advisors dc:contributor.advisor
-
- McMasters, Alan W.
- Read, Robert R.
Rights
dc:rights- Statement dc:rights
-
- Approved for public release; distribution is unlimited.
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10945/23190