Back to search

Monterey, California. Naval Postgraduate School

Cost, schedule, and performance tradeoffs in the acquisition of major weapon systems.

Abstract

dc:description.abstract

In the current period of fiscal restraint, the acquisition of weapon systems has come under ever increasing scrutiny. Costs of these systems are influenced by performance characteristics of the system and schedule demands placed on the acquisition process. The objective of this thesis is to investigate previous research performed in the area of cost, schedule, and performance tradeoffs in the acquisition of major weapon systems. Results of the literature review indicate that several cost-schedule-performance models have been performed in two areas: aircraft airframes and aircraft turbine engines. Those models are compiled and explained. Methodological problems associated with tradeoff studies of this type are discussed. An annotated bibliography of relevant source documents is also provided.

Degree

thesis:*
Name thesis:degree_name
M.S. in Management
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Management
Grantor dc:publisher
Monterey, California. Naval Postgraduate School
Year dc:date.issued
1992

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Voltz, Jeffrey D.
Advisors dc:contributor.advisor
  • Boger, Dan C.
  • Sovereign, Michael G.

Rights

dc:rights
Statement dc:rights
  • Approved for public release; distribution is unlimited.

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10945/23848

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-11-20
Source record
OAI-PMH GetRecord
related terms
citation

Voltz, Jeffrey D.. Cost, schedule, and performance tradeoffs in the acquisition of major weapon systems.. Masters thesis, Monterey, California. Naval Postgraduate School, 1992. https://hdl.handle.net/10945/23848