Improving future construction project quality through analysis of completed contract documentation.

Abstract

dc:description.abstract

In my past experience as a construction contract administrator for the Navy, I administered many types and sizes of projects and noticed that a few projects resulted in either very satisfied or very dissatisfied customers, while most received no comment. Now, with quality issues in the forefront of society, I wish to answer the following question: Can future facilities be improved by studying the contract documentation of completed projects that were considered to be high or low quality? Of course the definition of quality encompasses different things to different people, for this research project, quality was judged by a committee of nine facility engineers, the people responsible for planning and upkeep of the completed construction projects, based on how well the facility meets the required function and its durability or maintainability The contract documentation will vary somewhat between organizations and will inevitably be more extensive for public projects. For most organizations, contract documentation follows a standard formal progressing from pie-award through close-out files and includes such things as constructibility reviews, bid results, correspondence, changes, daily inspection reports, submittals, A/C visits and disputes. The objective of this research was to develop and test a method that could aid in troubleshooting an organization's construction administration process to uncover recurring problems that should be eliminated; or solutions that should be institutionalized to improve the quality of future projects The parameters used to select the contracts to be analyzed can be customized to meet the particular circumstances of the organization under study. Tins paper will discuss the methodology and results of such a case study for the Naval Air Station, Whidbey Island located near Oak Harbor, Washington.

Degree

thesis:*
Name thesis:degree_name
Master of Science in Civil Engineering
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Civil Engineering
Department dc:contributor.department
Civil Engineering
Grantor
University of Washington
Year dc:date.issued
1992

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Stagg, Kenneth C.
Advisors dc:contributor.advisor
  • Jahren, Charles T.
  • Mannering, Fred L.

Identifiers

dc:identifier.*
OCLC
ocn640382301

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-11-21
Source record
OAI-PMH GetRecord
related terms
citation

Stagg, Kenneth C.. Improving future construction project quality through analysis of completed contract documentation.. Masters thesis, University of Washington, 1992. https://hdl.handle.net/10945/23921