Abstract
dc:description.abstractIn the mid-1980s the Jamestown Verrazzano Bridge was built in Rhode Island spanning the west passage of Narragansett Bay. The bridge was to be founded primarily on pre-stressed concrete piles acting as friction piles. A test pile program was conducted at the beginning of construction and the measured capacity of the piles was significantly lower than predicted values. This led to significant delays in construction, cost overruns, and ultimately led to a change in the design of the foundations. The overall objective of this thesis is to evaluate the results of the test pile program and attempt to understand why the measured capacities were so much lower than design values.
Degree
thesis:*- Name thesis:degree_name
- Master of Science in Ocean Engineering
- Level thesis:degree_level
- Masters
- Department dc:contributor.department
- Ocean Engineering
- Grantor dc:publisher
- University of Rhode Island
- Year dc:date.issued
- 2011
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Richardson, Brent D.
Rights
dc:rights- Statement dc:rights
-
- This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10945/24357