Massachusetts Institute of Technology
Risk-informed performance based regulatory implications of improved emergency diesel generator reliability
Abstract
dc:description.abstractThe Nuclear Regulatory Commission's (NRC) steady progress towards risk-informed, performance-based regulation (RIPBR) prompted the practical application of this regulatory tool in order to demonstrate its potential benefits. This practical demonstration makes up one part of an Idaho National Engineering and Environmental Laboratory (INEEL) sponsored project entitled Integrated Models, Data Bases and Practices Needed for Performance-Based Safety Regulation. Project members selected the emergency diesel generator system as a candidate for assessment because of its high risk importance for core damage frequency (CDF) as well as for its failure to exhibit fulfillment of its current maintenance objectives. An analysis of current NRC maintenance and inspection requirements of the emergency diesel generators at the Millstone 3 nuclear power plant was performed by the project members. Maintenance and inspection items identified as unnecessary or harmful to the EDG qualified as candidates for removal from the current surveillance schedule. Expert testimony and comparisons with similar non-nuclear utility industries aided in the identification of candidate items. Calculations of the subsequent risk, reliability, safety, and economic implications revealed several benefits of the inspection alterations. The modified inspection provided improved backup power availability and defense in depth during the refueling outage. A sensitivity analysis performed on the EDG basic events affected by inspection alteration showed that a 50% reduction in these basic event failure rates would decrease the EDG system failure probability by 13.9%. The altered inspection also shortens the plant's refueling outage critical path therefore decreasing the risk of fuel damage and improving the risk profile of the plant outage. Transfer of the revised inspection to performance while the plant is operating at power resulted in identical refueling outage benefits. Performance of the inspection at power requires an increase in the allowed outage time (AOT) of the plant. The subsequent rise in core damage frequency due to the increased AOT is considered negligible.
Degree
thesis:*- Name thesis:degree_name
- Master of Science in Nuclear Engineering
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Nuclear Engineering
- Grantor dc:publisher
- Massachusetts Institute of Technology
- Year dc:date.issued
- 1998
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Utton, Shantel M.
- Advisor dc:contributor.advisor
-
- Golay, Michael W.
- Committee member dc:contributor.committeemember
-
- Todreas, Neil E.
Rights
dc:rights- Statement dc:rights
-
- This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
- Distribution Statement A. Approved for public release: Distribution is unlimited.
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10945/24370