Back to search

Monterey, California. Naval Postgraduate School

Causes and effects of change orders at Naval Air Station, Corpus Christi, Texas.

Abstract

dc:description.abstract

This research studies causes and effects of change orders on construction contracts at Naval Air Station, Corpus Christi, Texas. It involves a comprehensive study of 157 change orders on 61 fixed price construction contracts and a detailed analysis of sources of change and cost and schedule sensitivities for different project types. Of particular significance are the findings related to predominant sources of change which if verified by other studies should steer the U.S. Navy towards modifying its policies towards owner requested changes

Degree

thesis:*
Name thesis:degree_name
M.S. in Engineering
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Engineering
Department dc:contributor.department
Engineering
College dc:contributor.school
NA
Grantor dc:publisher
Monterey, California. Naval Postgraduate School
Year dc:date.issued
1995

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Barrientez, Jose Ignacio

Subjects

dc:subject × 1

Identifiers

dc:identifier.*
OCLC
ocn640653363

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-11-20
Source record
OAI-PMH GetRecord
related terms
citation

Barrientez, Jose Ignacio. Causes and effects of change orders at Naval Air Station, Corpus Christi, Texas.. Masters thesis, Monterey, California. Naval Postgraduate School, 1995. https://hdl.handle.net/10945/25730