Monterey, California. Naval Postgraduate School
The alteration to the depot level maintenance strategy of the LPH 2 class: a cost comparison and readiness evaluation
Abstract
dc:description.abstractThis thesis examines the change in maintenance strategy of the LPH 2 class from the Regular Overhaul strategy to the Phased Maintenance strategy to determine if a cost savings has been achieved. Additionally, readiness was examined through the use of operational availability data and C3/C4 casualty report data to determine the impact of the change in maintenance strategy on readiness. The results of the analysis indicate that with the change in maintenance strategy, a significant cost savings was realized by the Navy. In addition, the research indicated that by both readiness measurements chosen, an improvement in readiness had occurred
Degree
thesis:*- Name thesis:degree_name
- M.S. in Management
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Management
- Department dc:contributor.department
- Management
- College dc:contributor.school
- Naval Postgraduate School
- Grantor dc:publisher
- Monterey, California. Naval Postgraduate School
- Year dc:date.issued
- 1994
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Williams, Brian D.
- Advisors dc:contributor.advisor
-
- Milligan, R. D.
- Terasawa, Katsuaki L
Subjects
dc:subject × 1Rights
dc:rights- Statement dc:rights
-
- Approved for public release; distribution is unlimited.
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10945/27940