Back to search

Monterey, CA; Naval Postgraduate School

Predicting aircraft equipment removals during initial provisioning period

Abstract

dc:description.abstract

An investigation was made into the characteristics of program elements and removals of Weapon Replaceable Assemblies aggregated at the system level for the purpose of developing a method to predict removals during initial provisioning periods. From examination of nine avionic systems over a 28 month period a binomial model was developed using a removal rate based on aircraft-months as a program element. The model is to be used before Fleet data are generated by obtaining aircraft-month estimates from the contractor and removal rate estimates from similar operational equipments. A probability distribution reflecting the degree of certainty is selected as a prior estimate. Then, as Fleet experience is accumulated the distribution is updated using Bayesian techniques and maturity growth curves. This distribution is used to give an estimate of current removal rate and to extrapolate to future removal rates.

Degree

thesis:*
Name thesis:degree_name
Master of Science in Operations Research
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Operations Research
Department dc:contributor.department
Operations Research and Administrative Sciences
Grantor dc:publisher
Monterey, CA; Naval Postgraduate School
Year dc:date.issued
1975

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Fincke, Edwin August
Advisor dc:contributor.advisor
  • Richards, F. Russell
Committee member dc:contributor.committeemember
  • Hartman, James K.

Rights

dc:rights
Statement dc:rights
  • This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
  • Approved for public release; distribution is unlimited.

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10945/30405

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Fincke, Edwin August. Predicting aircraft equipment removals during initial provisioning period. Masters thesis, Monterey, CA; Naval Postgraduate School, 1975. https://hdl.handle.net/10945/30405