Back to search

Monterey, California. Naval Postgraduate School

Contractor perspective of multiyear contracting for major system acquisitions

Abstract

dc:description.abstract

Multiyear contracting has largely fallen out of favor due to an inability to quantify savings, Congressional reluctance to commit appropriations for greater than one year and the restrictive nature of cancellation ceilings. Previous studies of multiyear contracting have concentrated on advantages to the Government and neglected the needs and motivation of industry. This study examines the perspective of prime contractors awarded a major system multiyear contract from 1985 to 1991. A survey was conducted to obtain the contractor perspective, counterbalanced with responses from the Government program offices which administered the contracts. This study concluded that: contractors desire a greater say in what programs are selected for multiyear; successful programs, as often as not, still contain an element of instability; contractors believe compensation for risk undertaken is not entirely adequate; and savings from multiyear are potentially greater but still derived entirely from economic order quantity purchases.

Degree

thesis:*
Name thesis:degree_name
M.S. in Management
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Management
Department dc:contributor.department
Management
Grantor dc:publisher
Monterey, California. Naval Postgraduate School
Year dc:date.issued
1994

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Gonzalez, Richard Frank
Advisors dc:contributor.advisor
  • Desbrow, Sandra M.
  • Lamm, David V
Committee member dc:contributor.committeemember
  • NA

Rights

dc:rights
Statement dc:rights
  • This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10945/30864

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-11-20
Source record
OAI-PMH GetRecord
related terms
citation

Gonzalez, Richard Frank. Contractor perspective of multiyear contracting for major system acquisitions. Masters thesis, Monterey, California. Naval Postgraduate School, 1994. https://hdl.handle.net/10945/30864