Monterey, California. Naval Postgraduate School
Projected manpower requirements of the next generation U.S. Navy destroyer
Abstract
dc:description.abstractIn this century destroyers have made up a large portion of the U.S. fleet and contributed to determining Navy-wide manpower requirements. Destroyers vary in mission and capabilities. Plans exist to begin development of the next generation destroyer (SC 21). The class is projected to begin construction in 2003. This study will project the ship-board manpower requirements and personnel costs based on historical trends, exploitable technology, and anticipated mission. Estimates will vary according to the degree that technology advances. Navy organizational constraints also effect manpower requirements and will be considered in the estimates. This study projects requirements based upon three scenarios involving technology and Navy practices.
Degree
thesis:*- Name thesis:degree_name
- M.S. in Management
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Management
- Department dc:contributor.department
- Management
- Grantor dc:publisher
- Monterey, California. Naval Postgraduate School
- Year dc:date.issued
- 1995
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Coe, James B.
- Advisors dc:contributor.advisor
-
- G., Hildebrandtm Gregory
- Parker, Patrick
Rights
dc:rights- Statement dc:rights
-
- This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10945/31530