Back to search

Monterey, California. Naval Postgraduate School

An approach to using Total Life Cycle Cost and Total Quality Management in project management in the Indonesian Navy

Abstract

dc:description.abstract

Project management is very important to many industrial and governmental organizations. For governmental organizations, projects are vehicles for growth and improvement. In the Indonesian Navy for example, project management is needed to develop new warships, such as destroyers or submarines. The goal of project management is to ensure a high quality result. Generally speaking, quality is defined as adherence to specifications and high quality is defined as exceeding those specifications. Not meeting the specifications is unacceptable quality. For a project like building a warship, the Total Life Cycle Cost can be considered primarily as a function of four things: design, construction, operation and maintenance. The selection of the design and the contractor are one time decisions and cannot be changed over the life of the ship. In contrast, operation and maintenance are on-going management decisions, yet they are largely determined by the design selected and the quality of the contractor's work. To have the lowest Total Life Cycle Cost, the right design and the right contractor must be selected. This thesis develops a Design Review Checklist and a Contractor Review Checklist that can be used in reviewing the contractor's design and the contractor's quality management capabilities.

Degree

thesis:*
Name thesis:degree_name
M.S. in Management
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Management
Grantor dc:publisher
Monterey, California. Naval Postgraduate School
Year dc:date.issued
1996

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Iskandar, Indarto.
Advisors dc:contributor.advisor
  • Fields, Paul J.
  • Fassnacht, F.B.

Rights

dc:rights
Statement dc:rights
  • Approved for public release; distribution is unlimited.

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10945/32252

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-11-21
Source record
OAI-PMH GetRecord
related terms
citation

Iskandar, Indarto.. An approach to using Total Life Cycle Cost and Total Quality Management in project management in the Indonesian Navy. Masters thesis, Monterey, California. Naval Postgraduate School, 1996. https://hdl.handle.net/10945/32252