Monterey, California. Naval Postgraduate School
CORRELATION OF READY FOR TASKING TO FULL MISSION CAPABLE METRICS FOR F/A-18E/F
Abstract
dc:description.abstractHistorically, the U.S. Navy has utilized Full Mission Capable (FMC) as the standard metric in assessing aviation readiness, but an alternative to FMC has been introduced by air wing commanders: Ready for Tasking (RFT). RFT is a less demanding standard for readiness that provides a better representation of mission success than FMC. Since FMC is used as an input to aviation repairable sparing models, before RFT can replace FMC in funding models it is necessary to analyze the linkage between RFT and FMC. This thesis explores the relationship between RFT and FMC based on five years of data from the East Coast Carrier Air Wings flying F/A-18E/F Super Hornets. Linear and logistic regression models are developed to analyze the impacts 11 common variables have on RFT. It also examines readiness trends throughout the Fleet Response Training Plan.
Degree
thesis:*- Name thesis:degree_name
- Master Of Science In Operations Research
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Operations Research
- Department dc:contributor.department
- Operations Research (OR)
- Grantor dc:publisher
- Monterey, California. Naval Postgraduate School
- Year dc:date.issued
- 2013
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Brooks, Bradley A.
- Advisor dc:contributor.advisor
-
- Whitaker, Lyn R.
- Committee member dc:contributor.committeemember
-
- DeGrange, Walt
Rights
dc:rights- Statement dc:rights
-
- Approved for public release; distribution is unlimited.
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10945/32798