Resource constrained scheduling problem at U.S. Naval Shipyards

Abstract

dc:description.abstract

Submarine repair schedules are some of the most complex schedules seen in project management. Repairs of a nuclear U.S. submarine are resource constrained since resources are divided among approximately thirty shops (e.g., electricians, welders, and pipefitters). The system complexity, the tight spaces, the operational nuclear reactor, the challenges inherent in repair, and resource competition all contribute to a dense integrated schedule. Minimizing the overall length of each project, the "makespan," is the primary objective function of this thesis. This thesis uses a commercially available simulation package, @Risk, to analyze a realistic submarine repair schedule. Simulation is used to analyze uncertainty in the task durations and identify crucial tasks that highly impact the makespan. Finally, a genetic algorithm is tested to assign resources to tasks and 7723 constraints or ties. A simulation assigned all 4038 tasks a triangle probability distribution with the duration set at plus or minus 10 percent of the original duration estimate. Sensitivity analysis of the simulation identified key task nodes having significant impact on the overall duration. These top ten crucial tasks were then given similar probability distributions and another simulation was run keeping the remaining 4028 tasks as determiniatic durations. Minimizing the makespan could only be executed on a small subset of data, 25 tasks, due to limiting assumptions on reducing task durations by assigning more resources. An overall improvement of 5.5-15.6% was achieved: this gives an indication of the approximate makespan optimization potential in current U.S. submarine repair, maintenance and overhaul operations.

Degree

thesis:*
Name thesis:degree_name
M.S. in Naval Architecture and Marine Engineering
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Mechanical Engineering
Department dc:contributor.department
Mechanical Engineering
Grantor dc:publisher
Monterey California. Naval Postgraduate School
Year dc:date.issued
2013

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Nawara, Terrence M.
Advisors dc:contributor.advisor
  • de Weck, Olivier L.
  • Thomas, Mark W.

Rights

dc:rights
Statement dc:rights
  • This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10945/40243

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-11-21
Source record
OAI-PMH GetRecord
related terms
citation

Nawara, Terrence M.. Resource constrained scheduling problem at U.S. Naval Shipyards. Masters thesis, Monterey California. Naval Postgraduate School, 2013. https://hdl.handle.net/10945/40243