Back to search

Monterey, California. Naval Postgraduate School

Time impact of Expanded Process Control Procedures (EPCP)

Abstract

dc:description.abstract

The United States Navy (USN) surface ships must receive maintenance and modernization in order to attain their expected lifetimes and the level of readiness that the Navy requires. A program called Enhanced Process Control Procedures (EPCP) aims to decrease the number and frequency of critical systems failures occurring during the maintenance availability. This research aims to identify the costs and benefits of the program, determine other factors that cause critical systems downtime and maintenance availability extensions, and provide recommendations to improve the EPCP program. The costs of the program are the increased time required to complete the work, greater funding requirements, decreased flexibility, and possible impact on the technicians. Analysis of EPCPs over an 18-month period between 2012 and 2014 revealed that the total time to develop, review, and correct the EPCP documentation averaged 28 days, with a standard deviation of 26 days. The 75% confidence value for the total administrative time required of an EPCP was almost 36 days. The author recommends using this time duration when planning a maintenance availability. The benefits of the program are a larger degree of accountability, lower probability of human error, and greater communication and coordination. The review of EPCPs suggest that the efficiency of the EPCP program could be improved by increasing the number of reused EPCPs, decreasing the number of EPCP errors, involving subject-matter experts in EPCP documentation, and decreasing the EPCP administrative temporal impact. Additionally, the author recommends the USN utilize an improved record keeping system to minimize delays in maintenance availabilities.

Degree

thesis:*
Name thesis:degree_name
Master of Science in Systems Engineering
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Systems Engineering
Department dc:contributor.department
Systems Engineering (SE)
Grantor dc:publisher
Monterey, California. Naval Postgraduate School
Year dc:date.issued
2014

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Joseph, Jeremy C.
Advisor dc:contributor.advisor
  • Langford, Gary O.
Committee member dc:contributor.committeemember
  • Angelis, Diana I.

Rights

dc:rights
Statement dc:rights
  • This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
  • Approved for public release; distribution is unlimited.

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10945/42652

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Joseph, Jeremy C.. Time impact of Expanded Process Control Procedures (EPCP). Masters thesis, Monterey, California. Naval Postgraduate School, 2014. https://hdl.handle.net/10945/42652