Back to search

Oregon State University

Effects of Contract Delivery Method on the LEED™ Score of U.S. Navy Military Construction Projects (Fiscal Years 2004-2006)

Abstract

dc:description.abstract

This research study focused on determining the effects that the two major contract delivery methods had on the LEED score of projects over the design and construction time horizon. The Navy uses almost exclusively Design-Bid-Build and Design-Build contracting methods to deliver Military Construction (MCON) projects. Twenty-five projects were analyzed and there were no statistically significant results that could support a conclusion that delivery method adversely or positively affected the LEED score over the project horizon. This result is useful because it encourages the management of Navy construction contracts to look at other areas to increase LEED score rather than delivery method.

Degree

thesis:*
Name thesis:degree_name
Master of Science
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Science
Grantor dc:publisher
Oregon State University
Year dc:date.issued
2005

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Carpenter, Deanna Shane

Rights

dc:rights
Statement dc:rights
  • This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10945/44431

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Carpenter, Deanna Shane. Effects of Contract Delivery Method on the LEED™ Score of U.S. Navy Military Construction Projects (Fiscal Years 2004-2006). Masters thesis, Oregon State University, 2005. https://hdl.handle.net/10945/44431