Oregon State University
Effects of Contract Delivery Method on the LEED™ Score of U.S. Navy Military Construction Projects (Fiscal Years 2004-2006)
Abstract
dc:description.abstractThis research study focused on determining the effects that the two major contract delivery methods had on the LEED score of projects over the design and construction time horizon. The Navy uses almost exclusively Design-Bid-Build and Design-Build contracting methods to deliver Military Construction (MCON) projects. Twenty-five projects were analyzed and there were no statistically significant results that could support a conclusion that delivery method adversely or positively affected the LEED score over the project horizon. This result is useful because it encourages the management of Navy construction contracts to look at other areas to increase LEED score rather than delivery method.
Degree
thesis:*- Name thesis:degree_name
- Master of Science
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Science
- Grantor dc:publisher
- Oregon State University
- Year dc:date.issued
- 2005
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Carpenter, Deanna Shane
Rights
dc:rights- Statement dc:rights
-
- This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10945/44431