Back to search

University of California, Berkeley

US Navy Underwater Construction Team Operations: Knowing the Risks

Abstract

dc:description.abstract

Human and Organizational Factors account for eighty percent (80%) of high consequence accidents in engineered systems (Bea 2001). To achieve high quality in the lifecycle of increasingly complex engineered systems, it is imperative that we assess and manage the risks attributed to human and organizational factors of the system. A key step in mitigating these risks is to capture and build on the knowledge gained from previous experience. To this end, a repository of Best Practices and Lessons Learned (BP/LL) that is stored for efficient future recall is proposed. By learning what has and has not worked in the past, project planners with little experience can more proactively manage the risk inherent in complex engineered systems and ultimately achieve higher quality.

Degree

thesis:*
Name thesis:degree_name
Master of Engineering in Ocean Engineering
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Ocean Engineering
Grantor dc:publisher
University of California, Berkeley
Year dc:date.issued
2002

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Saum, Michael R.
Advisor dc:contributor.advisor
  • Bea, Robert G.

Rights

dc:rights
Statement dc:rights
  • This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10945/47196

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Saum, Michael R.. US Navy Underwater Construction Team Operations: Knowing the Risks. Masters thesis, University of California, Berkeley, 2002. https://hdl.handle.net/10945/47196